On this page
The short answer
A founder running more than one company will be asked the same thing sooner or later: how do you split your time? The honest answer is that you do not split it. You choose it, one week at a time, and you accept that some companies will get less of you than they would like.
This post is how I make that choice. It is written for founders and operators who run, or are about to run, more than one company. Each section stands on its own, so read the one you need.
How do you split your time across several companies?
You stop thinking of it as a split. A split sounds fair, and fair is the wrong target. Every company has weeks when it needs a lot of you and weeks when it needs almost none, and an even division gives each of them the wrong amount most of the time.
I work from the week instead. On Sunday I ask which company has the decision or the problem that nobody else can carry. That company gets the first and best blocks of my time. The others get a shorter, fixed touchpoint with the person who runs them. A company that is running well should need me only for decisions, not for supervision.
The rule underneath is simple. Time goes where my judgment changes the outcome, not where the noise is loudest.
What does it mean when a company needs me?
It is easy to mistake being asked for with being needed. A company needs me when one of three things is true.
The first is a decision that only I can make: a direction, a hire for a senior seat, a trade-off between two good options where someone has to own the cost. The second is a standard that is slipping and the person responsible cannot fix it alone. The third is a person who is stuck and who is waiting on me, not on the work.
Everything else is a request, and a request can usually be answered by the leader of that company. If a leader brings me something they could have decided, I do not take it back. I ask what they would do, and I tell them to do it.
How do you choose when two companies both want you this week?
I put four questions to each of them, in this order.
What has a date that cannot move? A deadline that someone else controls beats a deadline I set for myself.
What is hard to undo? A decision that can be reversed next month can wait or be delegated. A decision that locks in a direction needs me in the room.
Who is waiting on me? A leader blocked on one answer costs the company more than almost any task I could be doing.
What will matter in a year? Some weeks the urgent thing is not the important thing, and the company that gets the time is the one building something that will still be there.
When the answers point to one company, the week is settled. When they point to two, I choose the one where the decision is harder to reverse, and I give the other a short, scheduled block and a clear answer on what can wait.
How do you keep one company from taking the whole week?
By putting the blocks in the calendar before the week starts, not after. A company that is on fire will take every hour you leave open, so I do not leave them open.
I keep two habits. I work in blocks of a single company rather than hopping between them, because switching costs more than it looks and the second company always gets the tired half of you. And I end each block by writing down the next decision and who owns it, so that when I come back I am not rebuilding the story from memory.
If an emergency does take the week, I say so to the other leaders plainly and tell them when I will be back. People can work with a late answer. They cannot work with silence.
What do you stop doing so the time exists?
The time does not exist until something is removed. For me that has meant three things.
I stopped attending meetings where I was a spectator. If a leader can run the meeting and send me the decision, that is the better use of both of us.
I stopped being the answer to questions that have a standard. If the company has a written way of doing something, the question goes to the document first and to me second. Writing the standard down costs an afternoon and saves a hundred small interruptions.
I stopped treating every company as if it needed the same kind of founder. One needs direction, another needs a firm hand on quality, another needs me to get out of the way. Giving each the thing it actually needs takes less time than giving each everything.
What happens to the companies that do not get your time this week?
They run, and that is the point. A company that stops when the founder looks away has a staffing problem and a systems problem, not a time problem.
This is why the people running each company matter more than my calendar does. I choose leaders who can decide without me, I give them the standard to work to, and I check the work against that standard rather than over their shoulder. A short, regular conversation tells me more than a long, occasional one.
It also means being honest about trade-offs. When one company gets my week, another gets a slower answer from me. I would rather say that out loud than pretend I can be everywhere.
What is the mistake to watch for?
Giving your time to the company you enjoy most. It is natural to spend the week where the work is most interesting, or where the people are easiest, or where you know the problem best. None of those is a reason. The company that deserves the week is the one where the next decision is hardest and your judgment matters most, and that is often the one you would rather avoid.
The second mistake is the reverse: treating every company as an emergency so that you are never wrong. That is a way of being busy, not a way of choosing.
What can you do this week?
Before Monday, write down every company you are responsible for and, beside each, the single decision that only you can make in the next seven days. If a company has none, it does not need your best hours. If two have one, run the four questions above and pick the harder decision first.
Then put the blocks in the calendar.